The Catalytic Cracking Unit arrived at the refinery

The Catalytic Cracking Unit (FCC) arrived at the Esmeraldas Refinery after crossing 11 km of the city, from the maritime port; where it arrived last Friday.

The Unit weights 184 tons, and the enormous device reached the country on board the cargo ship Jumbo Ship, and starting at 07:00 on Saturday, it was towed on a land platform of 112 tires and a trailer as guide.

Two cranes with capacity of 500 tons each, placed the reactor in a hydraulic platform of 420 tons which transported it to the loading courtyard. A job with comprehensive logistics that allowed the development of the country.